West Moorabool Fencing Day 2.0
We conducted the initial visit to Ian on October 20, 2019. We installed the star picket fences posts and ran the main wires to be used for the sheeplok fencing.
The remaining work is to construct a short fence along a steep hillside right next to the main access track and then also raise and secure the sheeplok fencing along the circa 300m of fencing wires already constructed.
Our thoughts are that the bulk of the work has been done and that the main tasks per the above scope are:
- Construction crew for short fence (start pickets, plain wire x 3, secure used sheeplok which is around 900mm in height.
- Main fence sheeplok team (install and stand up sheeplok, secure to main wires with circular staples)
- Camp Kitchen team (provision food for the other two teams so we can maximise the time we are fencing).
This second trip would be an overnight camp on the property and a communal dinner on the Saturday night. Via Slack, the dates of April 5 and April 26 have been mooted. So let us know if you want to go - you can ping us back with interest and your preferred one of those two dates via here
Project Lead contact: Dave McKinnon